
NEWS CENTER
Shandong Xinglu Chenghong New Material Technology Co., Ltd.year Hydroxy acrylate relocation and transformation and trade reservoir area project The first publicity of public participation in environmental impact assessment
Time of issue:
Apr 23,2023
Shandong Xinglu Chenghong New Material Technology Co., Ltd. 16,000 tons/year acaldehyde, 10,000 tons/year
Hydroxy Acrylate Relocation and Reconstruction and Trade Reservoir Area Project
Environmental Impact Assessment Public Participation First Announcement
Overview of the project
Project Name: 16,000 tons/year of acral, 10,000 tons/year of hydroxyl acrylate relocation and transformation and trade reservoir area project
Construction unit: Shandong Xinglu Chenghong New Material Technology Co., Ltd
Project investment: 650 million yuan
Construction site: Taiwan Industrial Park, Gaoqing County, Zibo City, Shandong Province.
Main construction contents: The project covers an area of 100 mu, construction of a 16,000 tons/year production line of acrylic acid plant, with an annual output of 16,000 tons of acrylic acid and a by-product of 1,200 tons of acrylic acid; construction of a 10,000 tons/year hydroxyl acrylate plant, with an annual output of 8,000 tons of acrylic acid-2-hydroxyethyl ester; 1,000 tons of acrylic acid-2-hydroxypropyl ester; 500 tons of methacrylic acid-2-hydroxypropyl ester; build a trade reservoir area.
Contact information of the construction unit
Construction unit: Shandong Xinglu Chenghong New Material Technology Co., Ltd
Contact: Mr. Geng
Phone: 0533-6538000
E-mail:info@xingluchem.com
Mailing address: Taiwan Industrial Park, Gaoqing County, Zibo City, Shandong Province
Zip code: 255000
The name of the preparation unit
Compilation unit: Nanjing Kehong Environmental Protection Technology Co., Ltd
Address: 11th Floor, Building 6, No. 18, Jialingjiang East Street, Jianye District, Nanjing
Contact: 025-85280708
Telephone: 025-68661189
E-mail:khhb1980@VIP.163.com
Procedures and main contents of environmental impact assessment
The main work procedure is to basically grasp the factors related to the production and environment of the project through the investigation and analysis of the surrounding environment, and to consult the materials, on-site inspections, consulting engineering and technical personnel, etc., and to predict the impact of the project on the surrounding environment through mathematical model calculation and other methods. At the same time, it proposes improvement measures for the problems existing in the environmental protection of this project, and prepares the environmental impact report of this project on this basis, so as to provide a scientific decision-making basis for project decision-making and environmental management.
The main evaluation content is to strengthen engineering analysis and pollution source investigation, take engineering analysis, atmospheric environmental impact assessment, water environmental impact assessment, and pollution prevention and control countermeasures as the focus of evaluation, and analyze the links and production of pollutants in the production process of the project. Propose reasonable, economical and feasible pollutant control measures, and evaluate their feasibility, so that pollutants can be discharged up to the standard and the impact on the surrounding environment is minimized.
V. Main matters of public participation opinions
1. Any unit or individual with environmental protection interests can put forward opinions and requirements on the environmental protection feasibility of the project to the construction unit during the project environmental impact assessment work.
2. Any unit or individual with environmental protection interests may put forward opinions and requirements for improving project environmental protection measures and preventing project pollution during the project environmental impact assessment work.
3. After completing the first draft of the project environmental impact report, the construction unit will make an announcement again.
4. Any unit or individual with environmental protection interests can consult the simplified report after compiling the simplified environmental impact report of the project to understand the situation. The construction unit and the evaluation unit will provide convenience or answers.
5. The construction unit and the evaluation unit will carefully listen to the opinions of the public, and conduct the project environmental impact assessment in a scientific, fair, just and legal manner.
The specific form of soliciting public opinions;
During the preparation of the report, the public can fill in the public comment form for the construction project (see Internet connection), submit the completed public comment form to the construction unit by mail (subject to the postmark date), fax or email, and indicate the date of publication, real name and contact information.
Announcement issuing unit: Shandong Xinglu Chenghong New Material Technology Co., Ltd
February 18, 2019